PNVTEAM GROUP

House and residential space design

Design starts before the facade or visualisations are developed.

First, we need to understand:

  • who will live in the house;
  • how the family uses its space;
  • what site or premises are available;
  • what structures and utility networks are required;
  • what budget is realistic;
  • how the property will be built and maintained.

PNVTEAM connects residential design with future construction. Layout, architecture, structure, building services and working documents need to form a coordinated package.

Discuss your design project →

Planning starts with people.

To square meters, it's important to understand:

  • Family structure;
  • Age;
  • Visitors;
  • Work from home;
  • Habits
  • Storage;
  • a hobby;
  • Kitchen;
  • Rest;
  • privacy;
  • Children;
  • Domestic animals;
  • Motor vehicles;
  • plant and service rooms;
  • Possible family changes in the future.

The house shouldn't be a set of rooms from a model catalogue.

Life scenarios

It's useful to describe a normal day:

  • The entrance to the house;
  • Where they leave their clothes;
  • How are the purchases made;
  • Where they are prepared;
  • Where they eat;
  • Where they work;
  • Where children do their homework;
  • How they receive guests;
  • How the terrace is used;
  • where the seasonal one is stored;
  • How the machinery is maintained;
  • I don't know how the family moves at night.

These scenarios have a direct impact on the design.

House and apartment - different design tasks

Private home

The following should be considered:

  • The site;
  • Landing;
  • Access;
  • Scene;
  • Orientation;
  • The foundation;
  • Design;
  • The roof;
  • Facade;
  • External networks;
  • Engineering premises;
  • Improvement;
  • Explosion.

Apartment

The main restrictions have already been set:

  • Existing structures;
  • Struggles;
  • Ventilation channels;
  • Facade;
  • Windows;
  • Common home networks;
  • The rules of the building.

The housing project is more focused on:

  • Planning;
  • The interior;
  • Engineering;
  • Furniture;
  • Refinishing.

Design details and work planning

The house is designed with the place.

For a private house, it's important:

  • Dimensions;
  • Form of the site;
  • Orientation;
  • Scene;
  • Access;
  • Neighbouring buildings;
  • Species;
  • Sun;
  • Wind;
  • Existing networks;
  • Trees;
  • Limitations.

A house that looks good on its own may not work well on a particular site.

Baseline data of the site

Depending on the brief, the following may be required:

  • Topographic data;
  • Geology;
  • Existing networks;
  • Technical conditions;
  • Limitations of territory;
  • Documents/plans;
  • The actual situation at the site.

The necessary composition of the baseline data is determined by the task, the site and the design phase.

Wishes need to be turned into a project task.

The task is to record:

  • Who will live;
  • Area;
  • :: deck capacity;
  • Premises;
  • Priorities;
  • Restrictions;
  • Budget level;
  • Materials;
  • Engineering expectations;
  • Energy efficiency;
  • Autonomy;
  • Future implementation.

The terms of reference may be clarified.

But significant changes must be recorded, otherwise the project becomes an endless movement of purpose.

More is not always better

The additional area means:

  • More construction;
  • More heating;
  • More finish;
  • More cleaning;
  • more service.

The project should not be looking for a maximum area, but sufficient.

It's useful to separate:

  • Spaces actually used;
  • Communication areas;
  • Technical zones;
  • Storage;
  • a reserve for future needs.
Planning

The layout shall link:

  • Entry;
  • Common areas;
  • Private areas;
  • Bedrooms
  • Sanitation;
  • Kitchen;
  • Storage;
  • A ladder;
  • plant and service rooms;
  • Furniture;
  • Engineering stickers.

Bad design isn't fixed by expensive trim.

The dimensions of real things are important to engineering.

Before electricity and light, it is desirable to know:

  • Kitchen;
  • closets;
  • The beds;
  • Couchs;
  • Desks;
  • Television;
  • Technology;
  • Plumbers.

This affects:

  • Discharges;
  • Switches;
  • Light;
  • Water;
  • Sanitation;
  • Ventilation;
  • Mortgages.
Kitchen

The kitchen is one of the most heavily populated areas of engineering.

We need to tie it up.

  • Furniture;
  • Fridge;
  • Warm surface;
  • The oven;
  • extraction;
  • Washing;
  • A dishwasher;
  • Water;
  • Sanitation;
  • Electrician;
  • Light;
  • Ventilation.

Decisions must be determined before clean work is done.

Sunhouses

The project should take into account:

  • Positioning of instruments;
  • Struggles;
  • Tracks;
  • The slopes;
  • Ventilation;
  • Hydroinsulation;
  • Audits;
  • Furniture;
  • Electrical zones;
  • Services.

The number of sanitary units affects both architecture and engineering.

Lack of storage quickly turns a good interior into chaos.

Think:

  • Topwear;
  • Shoes;
  • Cleaning equipment;
  • Products;
  • Seasonal items;
  • Sport;
  • suitcases;
  • Instruments;
  • Technical supplies.
Technical premises

For a private house, it may be necessary:

  • boiler room;
  • Electrical protection zone;
  • Water training;
  • Ventilation equipment;
  • server / network;
  • Batteries;
  • Inverter;
  • The economic zone.

They cannot be designed as a residual area.

Form should be linked to plan and design

Architecture defines:

  • Volume;
  • Proportions;
  • Facade;
  • Windows;
  • The roof;
  • The connection at home to the station.

But the appearance shall be fulfilled and consistent with:

  • By design;
  • Warming;
  • Water drainage;
  • Engineering;
  • Materials;
  • budget.

MultiStyle

multistyle.org

Structural design

Depending on the project, the design may include:

  • The foundation;
  • Walls;
  • Columns;
  • beams;
  • Curves;
  • stairways;
  • The roof.

Architectural and structural designs should be reviewed together.

You can't first approve the form and then find a way to technically hold it without changing the design.

Engineering systems — part of the home project

Within the agreed scope:

  • Electricity supply;
  • Lighting;
  • heating;
  • Ventilation;
  • Conditioning;
  • Water;
  • Sanitation;
  • Weak grids;
  • Communication;
  • Automatics;
  • Emergency power.

Not every project includes a complete set of sections.

Electricity

Design taking into account:

  • Real furniture;
  • Technology;
  • Strong consumers;
  • Outer areas;
  • lighting;
  • Engineering equipment;
  • Reservation.

The shield and electrical logic must be in line with the use of the home.

Ventilation

Particularly important for:

  • An energy efficient house;
  • firm windows;
  • Sanitation units;
  • Kitchen;
  • wardrobe;
  • Technical premises.

Ventilation must be considered before ceilings are designed without space for air ducts.

Heating and cooling

Decisions depend on:

  • Heat loss;
  • windows;
  • Orientation;
  • Square;
  • The use mode;
  • The energy source;
  • Ventilation;
  • It's a summer overheating.

Do not choose the system only by habit or by advertising equipment.

Water supply and drainage

You need to tie it up for the house:

  • Water sources;
  • Introduction;
  • Water training;
  • Apparatus;
  • Hot water;
  • Sanitation;
  • External networks.

The location of wet zones affects the cost and the design simplicity of the project.

The solution is architecture and engineering together.

Take into account:

  • Form;
  • Orientation;
  • Windows;
  • Shading;
  • Warming;
  • Cold bridges;
  • Leakproofness;
  • Ventilation;
  • Heating.

ZeroHouse

zerohouse.com.ua

Summer overheating

Designing a warm house without the control of the summer sun can cause discomfort.

Consider:

  • The orientation of windows;
  • External shade;
  • Curtains;
  • Terraces;
  • Plants
  • Ventilation;
  • Decisions for cooling.

Not design energy efficiency only for winter.

Self-sufficiency

If this is important to the owner, identify critical systems in advance:

  • heating;
  • pumps;
  • Fridge;
  • Communication;
  • Lighting;
  • Gate;
  • Security;
  • Ventilation.

It is then possible to design:

  • Emergency electrical lines;
  • The battery;
  • Inverter;
  • Generator;
  • Solar;
  • Automation.

The need for autonomous systems is determined by the objectives of a particular home.

Digital and intellectual systems

May include:

  • Network;
  • Wi-Fi;
  • Chambers;
  • Access;
  • Automation;
  • Monitoring;
  • Accounting;
  • server devices.

AVGZ

avgz.net

The necessary infrastructure should be installed before finishing work begins.

Budget is a design constraint, not an afterthought

Value is influenced by:

  • Area;
  • :: deck capacity;
  • Design;
  • Overflight;
  • Form;
  • The roof;
  • Facade;
  • Windows;
  • Engineering;
  • Level of trim;
  • Equipment.

If the budget is limited, it is better to make decisions at the project stage than to cheaply replace an already developed facility with chaotic replacements.

Project and estimates

The working documentation shall enable:

  • Identify quantities;
  • Comparison of materials;
  • Evaluate engineering systems;
  • Formulate estimates;
  • Comparison of contractor proposals.

The fewer solutions in the draft, the more solutions will go to:

I'll make a decision on the construction site.

Design details and work planning

Design/ Concept and Work Project

Concept

Answers:

  • What we build;
  • How space is organized;
  • What volume;
  • I don't know what character it is.

Working project

Shall transmit sufficient technical information for harmonized implementation.

Visualisation

Useful for agreeing on:

  • Materials;
  • Proportion;
  • Colours;
  • The atmosphere.

But it doesn't automatically say:

  • Dimensions;
  • Design;
  • Electrician;
  • knots;
  • Engineering ties.
Housing interior project

For an apartment or interior, the agreed composition of the house may be:

  • A measurement plan;
  • Planning;
  • Dismantling;
  • Installation;
  • Furniture;
  • Sex;
  • A ceiling;
  • Light;
  • Discharges;
  • Switches;
  • Plumber;
  • Openings;
  • Materials;
  • Specialized items.

The composition is determined by the task.

Private home project

May include:

  • Landing;
  • Architecture;
  • Facade;
  • Cuts;
  • Design;
  • External engineering links;
  • Heat contour;
  • Separate specifications.
Reconstruction project

If an object exists, sufficient information on:

  • Geometry;
  • structures;
  • Engineering;
  • defects;
  • Previous changes.

Housing

StroyAudit

A change of one room may affect several sections

For example, kitchen transport affects:

  • Water;
  • Sanitation;
  • Ventilation;
  • Electrician;
  • Furniture;
  • The ceiling.

Changes therefore need to be:

  1. Record;
  2. Check;
  3. Update related decisions.

Do not continue to work on the old version of the draft.

Design document version control

For implementation, it is important that:

  • from the customer;
  • From the contractor;
  • From engineers;

It was an up-to-date version.

Main PNVTeam Position

PNVTEAM is relevant where a design needs to progress beyond a visual concept.

We link project decisions to questions:

  • Whether it is possible to build;
  • How to count;
  • What are the steps?
  • What to order;
  • Where sections are in conflict;
  • I don't know what decisions to make in advance.

Construction of the house

Architecture and design

Deep project specialization

MultiStyle specialises in architecture, planning, interior design and visual design.

PNVTEAM:

  • Link the project to implementation.

MultiStyle:

  • To develop space, architecture and design in a coherent way.

multistyle.org

PNV.KIEV

For a private house:

  • Designed technologies;
  • The foundation;
  • Walls;
  • The roof;
  • Materials;
  • Detailed construction solutions.

pnv.kiev.ua

ZeroHouse

For:

  • The principles of the passive house;
  • Heat contour;
  • Leakproofness;
  • Ventilation;
  • Energy efficiency;
  • Autonomy.

zerohouse.com.ua

StroyAudit

For the existing house:

  • Survey;
  • defects;
  • Heat-inspection diagnostics;
  • Technical condition.

stroyaudit.com.ua

Sequence of work

01. Project brief

Family, functions, priorities.

02. Project information

Section / space / existing facility.

03. Design brief

We'll fix the requirements.

04. Layout options

Checking the main scenarios.

05. Concept

Volume, architecture, image.

06. Structural coordination

Checking implementation.

07. Building services strategy

Defining systems and zones.

08. Detailed design

Working solutions.

09. Specifications

The agreed composition of the work.

10. Budget review

Compute solutions with future implementation.

11. Documentation package

Transmitting the current version.

12. Delivery / project support

If it's a matter of business.

What can be passed on to PNVTeam

Possible composition of work:

  • Collection of tasks;
  • Analysis of baseline data;
  • Coordination of architectural development;
  • Planning decisions;
  • Coordination of constructive solutions;
  • Coordination of engineering sections;
  • Preparation of estimates;
  • Communication with the future contractor;
  • A separate follow-up to implementation.

Questions and answers

From the precinct, the composition of the family, the life scenarios, the square, the engineering expectations and the budget, and then the technical task is formed.

The functional program and requirements may be discussed, but decisions depending on the site cannot be considered final.

No. The page also refers to apartments and living spaces, but the composition of documentation varies.

The need for and volume of engineering baseline data are determined by the type of facility, site and design objective, and decisions that depend on the soil must be based on sufficient data.

Only if it is included in the agreed composition.

This is also defined by the brief.

It can enter as a separate task. A deep specialization in architecture and interior is linked to MultiStyle.

It's not always useful for harmonizing appearances, but it doesn't replace working materials.

It can be viewed as a basis, but it needs to be tested for applicability to the site, networks, family requirements, and future construction.

Changes may be possible, but should be verified under the bound sections before performing the dependent work.

By type of object, stage, baseline, section composition and level of detail, the universal price per m2 is not published on this page.

The conditions of guarantee are determined by the contract and the type of work.

Send What

For home.

  • Map of the site;
  • Documents / site plan;
  • Topography, if any;
  • Geology, if any;
  • Photographs;
  • Illustrative area;
  • Family structure;
  • List of premises;
  • Reference;
  • Network data.

For the apartment.

  • Plan;
  • Measurement;
  • Photo;
  • Family structure;
  • Furniture / machinery;
  • Requests;
  • Existing project.

Don't demand a complete set at once.

Are you planning a house or a living space?

Send what you already have:

  • The site;
  • Plan;
  • Measurement;
  • Photographs;
  • Drawing;
  • Reference points.

If there's only an understanding of how you want to live, that's enough for the first discussion.

The following can be defined:

  • What baseline data are needed;
  • What the composition of the project works is;
  • What decisions need to be taken before construction or repair takes place.

Briefly describe your project and leave your contact details. If we need further information to provide a useful response, we will explain what to prepare.

You can include the approximate location, floor area and current project stage.

Enquiries are received and processed by the PNVTEAM team.

CallDiscuss your project