PNVTEAM GROUP

About the group

PNVTEAM GROUP is a construction group and a network of specialist projects providing coordinated property services.

The expertise required for each assignment is brought together: design, construction, renovation, reconstruction, engineering, technical analysis, energy efficiency, digital infrastructure and tools for operation and maintenance.

Not every project needs every service. The participants, scope of work and responsibilities are defined for each assignment.

One object requires different types of competence

Today's site is rarely limited to a single construction specialty.

A private house may require a site, design, design, engineering, energy efficiency, finishing and automation.

The commercial object is business processes, design, engineering loads, ventilation, electricity, networks, and IT.

The renovation starts with existing structures and may require a survey.

The Cottage City adds territory, roads, networks, general infrastructure, accounting, interaction with residents and exploitation.

Therefore, the PNVTEAM GROP model is not built around the idea of "one universal company does everything" but around the selection of the necessary competencies for a particular object.

Object as a single system

Design affects engineering. Engineering affects design and construction. Design affects architecture. Materials affect work technology. Energy efficiency depends on envelopes and engineering systems. Digital infrastructure must be in place before finishing.

Therefore, PNVTEAM GROP views the object as a system of interrelated solutions.

Four main areas

01. Construction

New residential and commercial facilities, private homes, cottage towns and shelters.

Construction

02. Renovation

Comprehensive work with existing residential and commercial spaces.

Repairs

03. Reconstruction

Significant change in the existing facility: design, design, area, roofs, engineering systems and performance.

Renovation ♪

04. Design

Planning and technical solutions for follow-up implementation.

Design

Each project has a role to play.

PNVTeam

Integrated implementation and coordination

PNVTeam is the central point for coordinated project delivery.

The challenge is to link:

  • The customer ' s task;
  • Baseline data;
  • Project decisions;
  • Construction phases;
  • Allied perpetrators;
  • Materials;
  • Engineering systems;
  • Time frame and consistency;
  • Agreed outcome.

PNVTeam brings the different aspects of a project into a coordinated delivery process.

PNV.KIEV

pnv.kiev.ua

Private home

In-depth specialization in private home:

  • The site;
  • The foundation;
  • Walls;
  • bricks;
  • Gas block;
  • Curves;
  • The roof;
  • Warming;
  • Facade;
  • Engineering;
  • Technology;
  • Value;
  • It's a phase.

On PNVTEAM, these topics are covered as part of the overall implementation, and on PNV.KIEV, they are described in detail.

PNV.KIEV →

Stroy-Brigada

stroy-brigada.kiev.ua

Integrated and separate phases of work

Stroy-Brigada handles projects requiring a substantial, clearly defined construction or renovation phase with agreed responsibilities.

Stroy-Brigada →

MultiStyle

multistyle.org

Architecture, planning and design

MultiStyle specialises in architecture and design.

  • architecture;
  • Planning decisions;
  • interior design;
  • Visualization;
  • Project solutions.

PNVTEAM explains how design connects with project delivery. MultiStyle explores the architectural and design aspects in greater depth.

MultiStyle →

StroyAudit

stroyaudit.com.ua

Construction audit and technical analysis

Depending on the brief, the following may be considered:

  • The state of the facility;
  • The quality of the work done;
  • Problem nodes;
  • Technical defects;
  • Heat inspection;
  • Individual surveys;
  • Analysis prior to reconstruction or purchase of an object.

StroyAudit →

ZeroHouse

zerohouse.com.ua

Energy efficiency, autonomy and modern home technology

  • Passive houses;
  • Energy efficiency;
  • Heat contour;
  • Leakproofness;
  • Ventilation;
  • Recovery;
  • Autonomous decisions;
  • Reserve.

Energy efficiency must be aligned with architecture, design and engineering.

ZeroHouse →

AVGZ

avgz.net

IT, software and digital infrastructure

AVGZ is a technology partner and operator within PNVTEAM GROUP.

Possible directions:

  • Software;
  • CRM;
  • Accounting;
  • Energy accounting;
  • Billing;
  • User offices;
  • Site sites;
  • servers;
  • utility networks;
  • Automation;
  • Programme systems of operation;
  • Integration of equipment.

AVGZ can contribute during design, delivery and operation.

Do not bring AVGZ to web development.

AVGZ →

Not hierarchy, but the composition of competence.

Do not draw a chart from the parent company of the parent companies.

An example for a private house:

  • PNVTeam — coordination;
  • PNV.KIEV — construction expertise;
  • MultiStyle — architecture / design;
  • ZeroHouse — energy efficiency;
  • StroyAudit — inspections when required;
  • AVGZ — digital solutions;
  • Stroy-Brigada — individual work packages.

This is an example of the possible composition of competences, and the participation of each project is agreed on separately.

For a commercial facility, reconstruction or cottage town, the combination may be different.

How a command is formed

01. Project brief

We determine what needs to be built, modified, designed or tested.

02. Project information

We're looking at the object, the project, the site, the current state, the restrictions, and the engineering conditions.

03. Expertise

We're going to determine what specializations are really needed.

04. Responsibilities

We'll fix who's in charge of the particular section and where the line of work passes.

05. Coordination

Linking related decisions and phases.

06. Delivery

The agreed composition of the work is being implemented.

20+ years

PNV, Domino and Sweetie experiences

PNVTEAM's historical experience includes the work of PNV, Domino and Sweetie.

The archive shows:

  • Construction of private houses;
  • The design phases;
  • Road works;
  • Engineering systems;
  • Refining;
  • Improvement;
  • Project materials;
  • Organization of integrated facilities.

20+ years of experience

150+ projects

The published experience is only part of the real

PNVTEAM has a larger archive of materials and completed work than is currently published on the website.

Reasons:

  • Confidentiality;
  • Agreements with the customer;
  • The private nature of the facility;
  • No need for publication;
  • Archives have not yet been systematized;
  • The photographs are not yet in full form.

The site shows a confirmed public part of the practical experience, not an exhaustive list of all the work done.

Photo Galleries

An original PNVTEAM GROUP project under development

Greenbor — the group’s own integrated development

Greenbor is not a member of PNVTEAM GROUP.

Greenbor is an original PNVTEAM GROUP project under development.

Its role is to demonstrate a systematic approach at the residential level where there is a need to link:

  • Concept;
  • Housing buildings;
  • Territory;
  • Infrastructure;
  • Engineering networks;
  • Roads;
  • Common systems;
  • Technology;
  • Explosion.

Greenbor shows that a project can encompass both an individual building and the wider environment in which it will operate.

Greenbor — a PNVTEAM GROUP project → greenbor.com.ua

Greenbor — a PNVTEAM GROUP project
Greenbor — an original PNVTEAM GROUP project under development · Visualisation

The difference between the PNVTeam model and the universal company

The group model does not allow for a separate internal division for each possible task.

For an object:

  • What competencies are needed;
  • What expertise is needed;
  • Which specialized projects are relevant;
  • What works can be combined;
  • Which is best left to a separate executive;
  • I'm gonna need some sort of coordination.

The key is the ability to form the necessary competencies, not an artificially large permanent structure.

Coordination

Even powerful professionals can conflict if everyone decides their own division.

Examples:

  • architecture does not take into account engineering mines;
  • Ventilation conflicts with design;
  • Electrician not aligned with furniture;
  • The facade does not account for warming;
  • Equipment requires capacity that is not available;
  • The finish covers access to engineering;
  • Digital systems are reminiscent after cable work.

Coordination means common baseline data, agreed solutions, understandable lines of responsibility and the transmission of information between participants.

Showing the process, not just the final shot.

The photo galleries show construction, building services and finishing stages, completed projects and historical materials from the team.

Watch the real work ♪

You don't need to know which group project you want.

For the first contact, it is sufficient to describe:

  • Type of object;
  • The current phase;
  • Expected outcome;
  • What is already available;
  • known problems.

The following is defined:

  1. Type of task;
  2. The necessary baseline data;
  3. The competence required;
  4. Possible team composition;
  5. The next practical step.

Discuss object / Send project or material

Recommendations

PNV construction group: how turnkey operations are organized

Read the material

Probe at the site: why a single responsibility centre is needed

Read the material

Questions to ask the site manager before work begins: what to clarify in advance

Read the material

The house as a system: why individual solutions should work together

Read the material

All recommendations

Questions and answers

PNVTEAM GROUP operates as a construction group and a network of specialist projects. The legal and contractual arrangements for each engagement are defined separately.

No. Participation is determined by a specific objective and agreed scope of work.

The format may include a separate substantive step or set of interrelated tasks.

Responsibility is determined by the agreed composition of the work and the contractual relationship of the particular project, and the PNVTeam can play a coordinating role in complex tasks.

The necessary staff of specialists and performers are being formed for the facility.

Greenbor is an original PNVTEAM GROUP project under development, not a separate member of the group.

Part of the work is not published because of confidentiality, customer arrangements and the private nature of the facilities; part of the historical and new photographic archives is still being systematized.

20+ years of experience.

150+ projects across different types of work. This is not the number of houses or turnkey developments delivered.

First, you don't need a brand choice, but an understanding of the problem.

Describe the object and the expected result.

If you already have a project, a budget, a plan, or a photograph, send it along with a message.

After initial analysis, it is possible to determine which competences of PNVTEAM GROP are actually needed for the next step.

Briefly describe your project and leave your contact details. If we need further information to provide a useful response, we will explain what to prepare.

You can include the approximate location, floor area and current project stage.

Enquiries are received and processed by the PNVTEAM team.

CallDiscuss your project