Houses, commercial buildings, residential developments and shelters in Kyiv and the Kyiv region.

We approach construction as a sequence of connected decisions: the site and initial information, design, cost estimates, site organisation, structures, building services, the building envelope, finishes and subsequent operation. The scope depends on the needs of the project.

Not every commission covers the entire process. The scope, responsibilities and deliverables for each stage are defined separately.

Discuss your project →
Construction of housing

First, source data and facility limitations

The mistakes of new construction often arise not because the separate operation was bad, but because the key decisions were taken too late.

Before the main work begins, it is important to understand:

  • What exactly is being built;
  • as an object to be used;
  • What are the conditions of the site;
  • What restrictions exist;
  • Which networks are available;
  • What draft has already been prepared;
  • What engineering requirements will be required for the building;
  • What the outcome of the selected phase should be.

For a private house, a commercial building, a cottage town and a hiding place, the basic data set is different, but principle one:

Construction should begin with an understanding of the site, not with the first available construction operation.

Four lines of construction

01. Turnkey houses

From the precinct to the working house — the agreed composition of the work

The construction of a private house may include site design, preparation, foundation, construction, walls, closures, roofs, windows, facade, engineering systems, interior works, improvements and selected technological solutions.

But the term "turnkey" does not automatically include all possible work lists.

The exact composition is recorded for a particular home in a project, budget and contract.

Home on the key.

pnv.kiev.ua

02. Commercial premises

Building to be prepared for business

The commercial site does not begin only with the space and appearance of the building; it is necessary to take into account the function, visitors, staff, equipment, storage and technical areas, electrical loads, ventilation, water, sewers, networks, IT and maintenance.

The design, design and engineering systems shall be consistent with one operating scenario.

Commercial premises

03. Residential developments

It's not just one house, it's all Wednesday.

The Cottage City requires a common logic of territory, houses, roads, engineering networks, drainage, upgrading, security, priority of construction, digital systems and further exploitation.

The repetition of one project at home does not replace the planning of the entire system.

Cottage towns

Greenbor

04. Shelters

The protective space begins with a task and a project

The shelter cannot be defined only by the thickness of the walls or by the name of the room.

Design and engineering decisions depend on the type of facility, the use scenario, the original design, the site, the number of users, the duration of stay, ventilation, water, electricity, communications, access and maintenance.

For special requirements, object categories and regulatory decisions, applicability needs to be checked separately.

Shelters

Sequence

Construction as a managed process

This is a common model. A specific object may start at another stage if some of the underlying decisions have already been prepared.

01. Project information

We determine the purpose of the site, the conditions of the site, the documentation available and the known limitations.

New construction may require:

  • Data on land;
  • Topographic material;
  • Geology;
  • Existing and planned networks;
  • Entry conditions;
  • Project materials;
  • The customer ' s demands.

A specific list is defined by the object.

02. Concept and brief

Let's fix what should be built and how the object should work after the completion of the relevant phase.

The functions, areas, zone relationships, engineering requirements, limitations and the desired level of readiness are specified.

03. Design

Architectural, structural and building services designs should be coordinated before clashes arise on site.

Depending on the project, the design scope may cover architecture, structural design, building services, specifications, details and information for cost estimating.

04. Cost estimate and phasing

After sufficient determination of the decisions, the structure of the value shall be established.

The estimate should show the composition of the work, quantities, materials, equipment, phases and organizational arrangements, not just the final figure.

05. Site preparation

Depending on the site, the work may require access arrangements, temporary utilities, fencing, welfare facilities, storage, earthworks, setting-out and ground preparation.

06. Foundations and structure

The load-bearing system is built in accordance with the design: foundations, walls, columns, beams, girders, floors, stairs and other structural elements.

It is particularly important to monitor until hidden sites are closed.

07. Roof and building envelope

A secure building volume is formed: roofing, waterproofing, windows, outside doors, warming, facade, fastening and water discharge — in an agreed composition.

08. Building services

The agreed scope may include power supply, lighting, heating, ventilation, air conditioning, water supply, drainage, low-current networks, communications, automation and backup power.

09. Finishes and procurement

Internal and external finishes are included only as agreed. The level of completion, materials and boundaries between construction and finishing stages are defined in advance.

10. Handover and ongoing operation

Depending on the project, the scope may include commissioning, system checks, snagging, as-built documents, operating instructions, maintenance and digital systems for property operation.

Not a universal package, but an agreed outcome

“Turnkey” means an agreed package of work for a particular property. The exact scope is defined by the brief, design, cost estimate and contract.

Design details and work planning

The most expensive mistakes are often invisible.

The finished trim does not show the quality of all the previous steps.

It is particularly important to monitor work that is later closed by construction or finishing:

  • Preparation of the ground;
  • Arming;
  • Mortgages;
  • Hydroinsulation;
  • Construction connections;
  • Bases;
  • Communications passageways;
  • Engineering routes;
  • Warming;
  • Protective layers;
  • Circumcisions;
  • Hidden connections of engineering systems.

Photos and other forms of control shall be used where they are provided for by the organization of the particular facility.

Walls cannot be chosen solely by advertising characteristics

Brick, gas unit, ceramic unit, framework and other solutions differ in load, moisture, heat, fastening, trimming, speed and performance requirements.

The material of the wall is considered together with the foundations, closures, roofs, warming, facade, windows, engineering passageways and operation.

Construction from the gas unit Construction from the gas unit

Brick construction ♪ Brick construction ♪

pnv.kiev.ua

Facility systems should be pre-established

Engineering decisions affect structures, heights, mines, openings, entrances, ceilings, floors, facades, roofs, furniture and technical spaces.

Therefore, during the construction phase, it is important to understand in advance not only the location of outlets or plumbers, but also:

  • Real loads;
  • Network routes;
  • Installation of equipment;
  • Access to services;
  • Contingency;
  • The possible development of the system.

For complex facilities, the engineering and digital layers must be consistent with architecture and design before major construction phases are closed.

The object must not only build, but also work.

For some of the facilities, after the construction phase, there are resource accounting, automation, engineering control, back-up, server and network infrastructure, personal offices, CRM, billing and maintenance.

These decisions are not binding on each project; they are connected where the scope and designation of the object justifies it.

AVGZ

IT, software and digital infrastructure.

avgz.net

PNVTEAM GROUP

By object, not by universal list of services

Different construction tasks require different specialists.

A private home may need some competencies, a commercial facility — others, a cottage town — working with a common infrastructure and operating model, shelter — selected design and engineering solutions.

The membership is therefore determined by the actual composition of the work.

PNVTeam

Integrated implementation and coordination.

PNV.KIEV

A private house and a deep building specialization. pnv.kiev.ua

StroyAudit

Construction audit and technical analysis where necessary. stroyaudit.com.ua

ZeroHouse

Energy efficiency, autonomy and systemic solutions at home. zerohouse.com.ua

AVGZ

Digital infrastructure and programme systems. avgz.net

The reference to the draft group does not imply its automatic participation in each facility.

Practical experience

Construction in real estate

The published photographs show the various stages of the construction work: site preparation, foundation, walls, closures, roofing, engineering communications, finishing and ready-made facilities.

This is an open part of PNVTEAM's experience, not a complete list of work accomplished.

The photographic archives are gradually being supplemented by newer objects and materials that can be published.

All photo Galleries

Residential developments

Greenbor

Greenbor — an original PNVTEAM GROUP project under development

Greenbor demonstrates a coordinated approach to residential development: individual houses, the site, infrastructure, shared systems, technology and operational arrangements need to be considered together.

Greenbor is not a standard specification for other residential developments.

More about Greenbor

greenbor.com.ua → greenbor.com.ua

Greenbor — a PNVTEAM GROUP project
Greenbor — an original PNVTEAM GROUP project under development · Visualisation
Project information

What to send for a substantive conversation

You don't have to have a complete set of documents. It's useful to pass on what already exists.

For a new object

Preferably:

  • A brief description of the task;
  • Indicative location;
  • Plan or map of the site;
  • Existing project or design;
  • The desired area;
  • Designation of the facility;
  • Known network data;
  • Photos of the site;
  • Policy requirements for timing or phasing.

If there's already a project

You can send:

  • PDF;
  • Plans;
  • Facade;
  • Cuts;
  • Main specifications;
  • Engineering materials;
  • Existing estimates, if necessary, for discussion.

If there is no project

This does not prevent primary treatment; in the first step, it is possible to determine which baseline data and design solutions will be required before the construction evaluation is completed.

Send a design or cost estimate

Cost depends on the composition of the facility, not on one indicator

Only the space of the building is not sufficient for a preliminary assessment.

Value is influenced by:

  • The conditions of the site;
  • Preparation of the Territory;
  • The foundation;
  • Design;
  • Material of the walls;
  • Curves;
  • The roof;
  • Facade;
  • Windows;
  • Engineering systems;
  • Level of trim;
  • equipment;
  • Logistics;
  • Access to the site;
  • The sequence of steps;
  • Time frame;
  • Additional organizational arrangements.
Before construction

Useful materials

Construction of the house: where the controlled facility begins

Read the material

Turnkey construction: Why not just the price per square metre is important

Read the material

Design before construction: Why Work Plan

Read the material

Communications at the precinct and in the house: why they are designed in advance

Read the material

The house as a system: why individual solutions should work together

Read the material

All recommendations

Questions and answers

The composition depends on the object and arrangement, which may be a separate construction phase or a set of interrelated works, ranging from site preparation and construction to engineering systems, finishing and selected operational solutions.

“Turnkey” means an agreed package of work for a particular property. The exact scope is defined by the brief, design, cost estimate and contract.

Yes, for the first discussion, it is sufficient to describe the site, the task and the expected outcome, after which it is possible to determine which inputs and project materials are needed.

Yes. The format may include a separate substantive step or set of interrelated works, the lines of responsibility being agreed upon before the commencement of the relevant phase.

Once sufficient baseline data are available, the cost is influenced by the project, design, engineering decisions, materials, site conditions, logistics, phasing and other parameters of the particular facility.

No. The construction direction includes private homes, commercial premises, cottage towns and shelters.

No. The composition of the team is determined by the object ' s objective. The participation of a specific specialized project or specialist is agreed on separately.

The conditions of guarantee are determined by the contract and the type of work.

Let's start with the problem and the raw data.

If the site has already been selected, there is a project or budget, send the material for the first discussion.

If the design has not yet started, describe the object you are planning and what is already known about the site.

The next step is the actual stage of the project, not the universal scenario.

Briefly describe your project and leave your contact details. If we need further information to provide a useful response, we will explain what to prepare.

You can include the approximate location, floor area and current project stage.