01. Project brief
Which should change.
A house may no longer meet a family’s needs, building services requirements or modern expectations for use and maintenance. This does not always mean it must be demolished and rebuilt.
Reconstruction can provide an opportunity for:
The starting point is an assessment of the existing building’s actual condition, before demolition work is considered.

Typical reasons:
Not every task automatically justifies reconstruction.
Sometimes rational:
This is determined after an object analysis.
Usually:
May affect:
If the line is not clear, the actual composition of the work is first determined.
The following should be considered:
Historic design documents are useful, but do not replace a condition survey.
Depending on the brief:
The inspection is not always equal to a complete technical survey.
StroyAudit
Useful:
But there are differences between documents and reality.
The actual pattern must be confirmed before the critical changes are designed.
The modification of the layout may include:
Before intervention, it is necessary to determine:
You need to know:
The design solution is individual.
The Annex requires agreement on:
Special attention:
The old and the new one.
It's where it's common:
Before a decision is taken, it is necessary to evaluate:
Sometimes lightly designed superstructures can be more rationally heavy.
But the choice of the system is a project task.
Reconstruction can change the load.
Therefore, in the case of significant changes, it is necessary to understand:
It is only required when there is a proven need.
The objectives of the renovation are as follows:
Any intervention must take into account the actual design of the closure.
Renovation of the roof may be related to:
The new roof shall be agreed with:
The following may be considered:
But energy efficiency is not just an additional layer of heater.
ZeroHouse
Check possible sources:
First, the reason is then the repairs.
Reconstruction is often the best moment to update:
Existing networks are not considered to be automatic.
When changing houses, it's important to check:
The renovation provides an opportunity to anticipate:
ZeroHouse / AVGZ — according to the agreed scope.
Architecture / interior design should take account of:
MultiStyle
Value is influenced by:
Sometimes hidden:
The contractor's task is not to promise that there is no unknown.
The challenge is to determine in advance:
Any significant change shall be estimated by:
Changes affecting the structure require a design review prior to the completion of the work.
Sometimes it's possible in a step-by-step scheme.
But we have to consider:
Copy production:
Whether residents can remain depends on the extent and phasing of the work. During substantial structural work, moving out temporarily is often safer and more practical.
It may be useful if:
But the sequence has to be design.
You can't fix a piece of the house if the next stage of the design requires it to be destroyed again.
Which should change.
Plans, photos, documents.
Actual geometry.
State of the house.
What we save, change and add.
Architecture, structural design and building services.
Which comes in handy.
Dismantling and construction procedures.
With the control of the critical stages.
Network upgrades.
After the design and engineering stages.
Let's fix the result.
Possible composition of work:
It's a possible composition of work, not an automatic package.
We're checking the documentation and the composition of the work.
Let's start with a survey and a concept.
Let's start by recording the actual status.
Could be relevant:
Stroy-Brigada
Go to:
Renovation of real estate
Integrated implementation and coordination.
Technical survey and analysis.
Architecture and the proposed layout.
Separate sets of works.
Energy modernization.
Digital systems and automation as required.
Only part of our completed work is publicly available.
With plans, photographs, descriptions of the desired changes and an assessment of the actual state of the house.
Feasibility depends on the site, existing structure, foundations, additional loads and design solution.
Only after an assessment of the capacity of the existing house to absorb the extra burden.
Sometimes it is possible, but the solution requires an analysis of the constructive design and the strengthening project.
If the task involves design, a sufficient survey is usually needed before the design solution.
Yeah, as background information, but it's not a substitute for actual measurements and real-state testing.
Sometimes, yes, the phase must be agreed so that subsequent work does not destroy what has already been done.
Depends on the volume of interventions and engineering outages.
The cost is determined by the baseline, the project and the actual volume of the work, and the price of the area is not reliable.
Record the actual status, determine the technical solution and agree on the modification of the project/estimate to the dependent works.
Only if included in the agreed composition of the work.
The conditions of guarantee are determined by the contract and the type of work.
Useful:
Don't demand a complete set.
Send plans, photos and a brief description of what you want to change.
If there's an old project, add it.
After initial analysis, it can be determined that:
Briefly describe your project and leave your contact details. If we need further information to provide a useful response, we will explain what to prepare.