01. Existing condition
Inspection, photos, plans, existing networks.
A comprehensive renovation requires more than calling in different trades one after another.
The layout must coordinate furniture, electrical installations and plumbing. Building services must be installed before walls, floors and ceilings are closed. Materials must suit the prepared substrates. The estimate must reflect the actual scope of work, not just the floor area.
PNVTEAM can undertake an agreed package of work for an apartment or house, from assessing its existing condition and planning the layout to building services, finishes and acceptance.

On one site, the following objects are running in sequence:
If each stage is dealt with separately, it is easy to have a conflict:
Comprehensive repairs are needed precisely to ensure that these decisions are agreed upon prior to the execution of the dependent work.
It is usually necessary to take into account:
Additional links may be made between:
If the problem at home involves:
It should be moved to the section:
Reconstruction.
It is useful to check before repair:
The availability of a "new" space does not mean that all grounds are automatically ready to be cleaned clean.
There is an additional need to understand the state of:
Part of the real volume can only be specified after removal.
Send:
It is important to check before the estimate:
Visualisations alone do not provide sufficient construction documentation.
For the initial discussion, it is sufficient:
The scope of design is further defined.
MultiStyle
“Turnkey renovation” means an agreed package of work for a particular apartment or house. The exact scope depends on its existing condition, the design, cost estimate and contract.
This may include:
But it doesn't automatically mean:
The agreed scope of work may include:
It's a possible composition of work, not an automatic package.
It is desirable to identify:
Otherwise, engineering starts to determine the interior by accident.
Before the finish, we need to agree on:
Do not reduce the electrician to the number of outlets.
Before closing the walls and floors, we need to determine:
In a private house, there may also be connections with:
If the composition of the work is beyond internal repair, it will be negotiated separately.
For an apartment, the scope may include:
In a house:
It is necessary to determine in advance:
Particularly important for:
The following shall be checked as applicable:
Photography helps:
The format of the act is determined by the contract and the nature of the work.
For wet zones, it is necessary to agree on:
The following checks shall be made before the finish:
Paint, tile, or expensive floors do not correct a bad base.
The final work may include:
The sequence is determined by the technology of specific materials and objects.
The repairs are always strictly top-down.
It is desirable to agree in advance on:
Of particular importance:
Value is influenced by:
Compare:
Did the contractors rate dismantling and training the same?
Is there an equal list?
Are electrical, water, heating and ventilation systems included?
Who supplies them?
Are they included?
Is it taken into account?
Is it clear?
Is it included?
Who's doing it?
How do we agree?
How's it going?
Two sentences with different compositions cannot be compared only with the total.
Before starting work, agree on:
In particular, order:
If they affect the sequence.
The change may affect:
It is necessary to determine in advance:
Additional work is agreed upon prior to its completion.
Especially in secondary housing, there may be:
You can't promise a completely fixed volume before opening up something that was physically impossible to verify.
But the way in which new conditions are discovered must be clear in advance.
Additional organizational part:
The rules of operation depend on the specific housing complex.
Further check:
If problems are found:
This may already require a separate construction or reconstruction task.
Copy production:
Whether residents can remain depends on demolition work, building services, dust, noise, water and electricity availability, the number of bathrooms and phasing. Moving out is often safer and easier to organise during a comprehensive renovation, but the decision is made for each apartment or house.
Inspection, photos, plans, existing networks.
What we keep, what we change, what we need.
We agree on dependent decisions.
Let's fix what's in a row.
Volumes, materials, phasing, long-term items.
Protection, organization, dismantling.
Electricity, plumbing, heating, ventilation and other harmonized systems.
Partitions, plaster, pinch, hydro-insulation, base.
Coatings and clean elements.
Harmonized equipment and articles.
Remarks, ballast, corrections.
Set the agreed result.
The agreed composition of the work is being verified and implemented.
We'll determine what's necessary before the work starts.
Let's start with measurements, tasks, and planning solutions.
Could be relevant:
Stroy-Brigada
Go to:
Reconstruction.
Integrated implementation and coordination.
Architecture, layout planning, interiors and design.
Selected integrated repair phases.
Checking the condition / defects if required.
For technical matters of a private house outside the interior.
Digital systems, networks and automation only if it's part of the task.

Renovation of the apartment in the Smaragdovyy

Only part of our completed work is publicly available.
From the initial state and understanding of the result. If there is a project, send it. If not, enough plan, photos, and a description of the needs.
Yes, if the documentation is sufficient for implementation, we check the size, engineering decisions and main dependences before the estimate.
Yes, but a sufficient set of planning and technical solutions must be identified before dependent work is done.
Only the agreed composition of the project, the estimates and the contract.
May be in whole or in part if included in the work.
This also depends on the agreed scope.
Not automatically.
The supply model is defined for a specific facility.
More background information is usually available for a new-build property. In an existing home, some concealed conditions can only be established after strip-out.
They should be separately aligned with the impact on cost and duration, if the situation permits.
Depends on volume, engineering, dust, noise, and phasing.
If the task significantly affects the carrying structures, the area, annex, superstructure or design, it should be considered as a reconstruction.
The conditions of guarantee are determined by the contract and the type of work.
For the first discussion, it is useful to:
Don't demand a complete set.
Send a project, an estimate, or a photograph of the object.
If there is a project, let's start with its analysis and scope.
If there is no project, we will determine what solutions need to be prepared prior to the renovation.
Briefly describe your project and leave your contact details. If we need further information to provide a useful response, we will explain what to prepare.