01. Gather project information
The site, the project, the sketches, the photos, the technical materials are what already exists.
If you need a contractor to deliver an agreed package of work on a house, PNVTEAM treats it as one coordinated project: from initial information and cost estimates to the structure, building services and chosen level of completion.
You can contact us with:
We first clarify the brief and initial information. We then define the scope of work, responsibilities, phasing and the basis for the cost estimate.
20+ years of experience150+ projects

This service is appropriate if it is important for you to hand over to one coordinating party a substantial part of the construction of the house and not to organize yourself dozens of unconnected phases.
Typical situations:
If only a separate stand-alone set of individual works is needed, it may be a Stroy-Brigada task, not a turnkey format.
When comparing contractors, it is useful to look beyond the total amount of the offer.
You have to understand:
A cheap proposal with an uncertain composition of work often cannot be compared to a more complete proposal.
Depending on the brief, the agreed scope may include:
It's a list of possible directions.
It does not mean the automatic inclusion of all paragraphs in each treaty.
“Turnkey” means an agreed package of work for a particular house. The exact scope is defined by the brief, design, cost estimate and contract.
For one customer, the result may be:
Therefore, the two turnkey sentences cannot be compared only at the total price until the actual composition is compared.
Send:
Before assessing construction, it is important to understand:
Enough for the first discussion:
The following is defined:
MultiStyle
PNV.KIEV
Before selecting a contractor, compare:
The site, the project, the sketches, the photos, the technical materials are what already exists.
We're going to determine what level of preparedness the house needs.
See if there's enough information to evaluate.
We divide:
Once sufficient amounts and solutions have been determined.
We define the sequence and the dependent work.
Treaty, budget, responsibility and rules of change.
A real proposal requires:
Therefore, the request:
How much is a 150 m2 house?
can only be used for a very rude preliminary conversation.
For the construction contract, the value must be based on a more specific composition.
Ideally, the proposal should make clear:
Main principle:
The more precise the composition of the work, the more accurate a comparison can be made between the proposals of the contractors.
Access, networks, topography, geology and other necessary data.
Architectural, structural and building services designs.
Temporary networks, access, warehousing, preparatory work.
In accordance with the design and the initial conditions.
Walls, columns, closures, stairs and other elements.
Blood, windows, warming, facade, waterproofing and related solutions.
Electricity, heating, ventilation, water, sanitation and other harmonized systems.
Black and clean steps in an agreed amount.
Closure of the agreed phase and fixation of the result.
In an integrated format, PNVTeam can play a coordinating role between:
The format of the coordination and responsibility of the PNVTeam is defined for a particular facility and is recorded in the agreed work composition.
Before the start of the phase, it is useful to identify:
Supply arrangements are not universal.
It should be part of an agreed model of a particular object.
Even if it's a good project, it can come out:
It is important to establish in advance:
Critical sites may include:
The format of verification is defined by the object and the treaty.
Photos may be used as part of control and subsequent use.
Before the closure, it is desirable to understand:
This does not mean that PNVTEAM automatically designs and executes all systems.
Building solutions should take into account the future engineering configuration of the house.
This block helps qualify the lead.
PNVTEAM reviews the supplied materials, checks whether the information is sufficient and prepares a proposal for the agreed construction scope.
The necessary design phase is first identified and then the construction evaluation can be carried out.
Design, construction, engineering and finishing can be linked in one sequence, but each block is only activated once agreed.
Send user to:
Stroy-Brigada
If the task is better suited to a separate set of individual works.
Construction is being considered together with the project, engineering and the next phase.
There's a public photographic archive of construction at different times.
20+ years
150+ projects
The necessary competencies of the group can be connected to the site.
With an integrated format, PNVTeam can perform a coordinating function.
Integrated implementation and coordination.
Deep specialization in private house.
Architecture, planning and design.
Energy efficiency, autonomy and modern home systems.
Selected integrated construction phases.
Technical analysis and verification where necessary.
IT, automation and digital infrastructure where the project requires them.
The involvement of a particular project is defined by the objective and is not automatic.
The archive includes:
This makes it possible to assess not only the appearance of the house, but also the real construction process.

Construction of a residential home

A residence with two houses and a pool ♪
Only part of our completed work is publicly available.
If there is a project:
If there is no project:
Do not require all items at the same time.
Once the material has been received:
Send a design or cost estimate
Send what you already have: the project, the sketch, the plot plan, the photographs, and a brief description of the desired result. After viewing, you can determine what data are missing for a meaningful evaluation.
Yes, if the project contains sufficient solutions for the agreed scope of work, its composition and applicability to a particular site should be checked before the evaluation.
Initial discussion is possible: prior to the construction evaluation, sufficient design and baseline data should be identified.
Only an agreed list of works is included in the draft, the estimates and the contract.
May enter in whole or in part if it is included in the work, but is not automatically implied.
Only if a specific level of trim is included in the agreed volume.
Yes, if this format corresponds to the task. For a separate stand-alone phase, there may also be a relevant Stroy-Brigada.
Based on the project, volume, materials, engineering, site conditions, logistics and the agreed composition of the work.
It is possible to discuss a very preliminary orientation, but the correct contract offer requires more data.
The supply model is agreed upon for a specific facility.
The form of control and documentation is determined by the contract and the organization of the facility, and critical work must be checked before closing it in the next phase.
The conditions of guarantee are determined by the contract and the type of work.
Send a project, a budget or a brief description of the future home.
If the project is already ready, let's start by analysing the documentation and composition of the work.
If there's only a site and an idea, we'll figure out what the baseline is before the construction evaluation.
Briefly describe your project and leave your contact details. If we need further information to provide a useful response, we will explain what to prepare.